Playbook

ReportInSite Playbook

How to turn exports from the tools you already run — Jira, Azure DevOps, GitHub, GitLab, Linear, Monday.com, Asana, ClickUp, Trello, ServiceNow, Datadog, Xero and more — or any CSV or Excel file, or numbers you type in, into a financial report, a steering scorecard, a flow and DORA review, a sprint review and a cross-team roll-up you can send to a steering group. It takes about ten minutes the first time — or thirty seconds with a Magic report.

Free plan, guaranteed until 30 June 2027. Pro is US$29 per report author a month with a 30-day free trial on every new account. See pricing.

Overview

Works with your tools

ReportInSite is not tied to one tool. It reads exports from the apps below through 43 ready-made recipes, grouped by where the data comes from, and anything else through the custom mapper (section 4). Teams on different tools sit side by side on the same scorecard and roll-up.

Dev tools

13 recipes
JiraAzure DevOpsAzure Test PlansTestRailXrayZephyrGitHubGitLabAzure PipelinesLinear

Feeds: Quality › Defect Leakage · Strategic & Risk › Tech Debt Items · Flow › Cycle Time (85th percentile) · Sprint reports + Delivery metrics · Quality › Test Pass Rate · DORA › Deployment Frequency · DORA › Lead Time for Changes · Flow › Throughput

Work management

9 recipes
Monday.comAsanaClickUpTrelloAny tracker

Feeds: Sprint reports + Delivery metrics · Flow › Throughput · Flow › Cycle Time (85th percentile) · Flow › Work in Progress · Flow › Work Item Age

Service & ops

12 recipes
ServiceNowJira Service ManagementDatadogUptimeRobotPingdomNew Relic

Feeds: Operations › Time to Resolve · Service Management › Mean Time to Resolve · DORA › Time to Restore Service · Service Management › SLA Met · Service Management › Incident Volume · Service Management › Open Backlog · Service Management › First Contact Resolution · DORA › Change Failure Rate · Operations › Support Lead Time · Systems Performance › System Uptime · Systems Performance › System Reliability

Business data

9 recipes
XeroMYOBSAPExcelFinance spreadsheetHarvestTempoClockifySurveyInSiteTypeformQualtricsGoogle FormsSurveyMonkeyAny survey toolAgile maturity surveySkills matrix (Excel)Risk register (Excel / GRC tool)Incident / breach register

Feeds: Financial › Opex Variance · Financial › Cost Recharge Variance · DevOps & Culture › Utilisation & Capacity · Customer Satisfaction › NPS Score · Customer Satisfaction › Customer Rating · DevOps & Culture › Agile Maturity · DevOps & Culture › Skills Coverage · Strategic & Risk › IT Risk Score · Strategic & Risk › Data Privacy Breaches

  • Sprint reports (committed vs delivered, scope waterfall, velocity and commitment trends) come from Jira (Sprint Report paste or issue export) and from Azure DevOps, Linear, Monday.com, ClickUp, or from a one-row-per-sprint spreadsheet.
  • DORA (deployment frequency, lead time for changes, change failure rate, time to restore), Flow (cycle time, throughput, work in progress, work item age, flow efficiency) and Service management (incident volume, mean time to resolve, SLA met, open backlog, first contact resolution) are metric packs. A recipe that targets one of them adds the pack to your framework automatically; you can also add a pack from the Framework tab.
  • Business data (budgets, timesheets, surveys, skills, risk and breach registers) fills the Financial, DevOps & Culture, Strategic & Risk and Customer Satisfaction areas from finance systems, time-tracking tools, survey tools or a spreadsheet.
  • Anything with a table works through Custom or the Magic report, which needs no mapping at all.
Section 01

Quick start

  1. Open the tool at reportinsite.com.au/tools/reportinsite. You can explore without an account; downloading a PDF or creating a share link asks for a free one (an email sign-in link, no password). Type your organisation's name in the box at the top left; it goes on your PDFs. The start screen asks What do you want to report on? and shows six reports side by side: Financial, Steering scorecard, Flow & DORA, Sprint review, Portfolio roll-up and Magic. Each card opens its report, and See a sample shows it on sample data first.

  2. Import your data. Open the Data tab, choose what you are adding, and import it (see section 3). Budget vs actual figures, incidents, deployments, sprint data and survey results can all come in; section 4 has a recipe for each app and section 7 covers finance figures.

  3. Set targets. On the Framework tab, give each metric you care about a target. Metrics without a target show grey.

  4. Read the report. The Scorecard, Financial, Flow & DORA, Sprint report, Roll-up and Trends tabs fill in automatically.

  5. Export. Export & share → PDF — steering pack gives you a landscape PDF of the whole picture.

Want to see a finished report first? Click Load sample data at the top of the tool. It loads three teams with eight sprints each and six monthly snapshots. Click Clear data at the top of the tool when you're ready for your own.

Reading charts

Every chart in the tool works the same way. Hover over a bar, dot, line or cell to see its exact value. The Table button at the top right of a chart shows the same data as a table (press it again to hide it), so you can read or copy the numbers; screen readers read that table even while it is hidden. On a dark screen the charts switch to colours chosen for a dark background; the PDFs always print in the light theme.

Section 02

Magic report

Magic is the fast way in: hand the tool any table and it builds a report your stakeholders can read, with no mapping, recipes or targets to set up. It suits a one-off export you've been asked to "make presentable" — a ticket list, a cost report, a survey download, a timesheet extract.

  1. Open the Magic report tab (or choose Magic on the start screen) and drop in a CSV or Excel file, choose one, or paste rows copied from a spreadsheet. Build the sample report shows what you get.

  2. Read it. The tool works out what each column is (dates, numbers, money, percentages, categories, identifiers) and writes a headline, a row of key numbers, up to six charts and a list of findings with the figures in them. About the data at the bottom says what was used, what was left out and anything to read with care, such as half-empty columns or duplicate rows.

  3. Say who it's for. The one choice Magic asks: senior stakeholders, a client, a board, or just you. It changes the tone of the narrative.

  4. Optional: write the narrative with AI. Press Write the narrative to have Claude turn the figures into a headline, a summary, findings and recommended next steps for that reader. It needs a free account (sign up with a magic link), it sends summary figures only — never your rows — and it should be read before it is shared. The Security & Data page has the detail.

  5. Export. Export & share → PDF — Magic report gives a portrait PDF of the whole page; Copy share link and Back up (JSON) include the Magic report too.

What Magic looks for. A date column gives trends by day, month or year. Numeric columns become totals and averages; a column with up to twelve distinct values (team, status, type, region) becomes a bar per value. Free-text and identifier columns are listed under "not used". If nothing numeric or dated is found, the report shows how the records are spread instead.

The chart is chosen by the job the data has to do

Magic picks each chart's form from the shape of the data, and says which form it chose and why under the chart and in the finding it supports ("Shown as a line chart because it is one number over 9 months"). It never draws a pie.

When the data hasMagic draws
One or two numbers and no date, or a single rowStat tiles: the value, plus the change on the previous period when there is a date.
A date and one numberA line chart in the accent colour; with twelve or more periods, a run chart with the usual range shaded.
A date and a grouping of up to six valuesA line per value, with the largest drawn in colour and the rest in grey behind it.
A grouping and a numberA sorted bar chart, largest first.
Two numbers on the same scale for each group (opened and closed, say)Grouped bars: a pair of bars per group.
A share of the whole with up to six partsStacked bars; with more parts the split is left out because it can't be read.
A plan, budget, target or forecast column beside an actualA variance chart: the gap to plan for each group as a bar, and as a percentage pin. Mint is favourable, rose unfavourable; for costs and budgets, under plan is favourable.
Durations per item (cycle time, lead time, days open), or a start and an end dateA scatter of each item by its finish date, with the p50, p85 and p95 lines. Only the dates and durations are kept in the report, never the item names.

Magic reads, it doesn't judge. It reports what the numbers are, not why. If a column is mostly empty or contains outliers, the report says so and the figures should be read in that light. For governance reporting with targets and red / amber / green status, or a financial report against budget, use the other reports in the sections that follow.

Section 03

Get your data in

On the Data tab, What are you adding? offers four kinds of data side by side: Finance figures, Export from any app, Metric values and Sprints. Sprints has four ways in of its own. The Jira paste exists because a pasted Jira Sprint Report gives sprint-start estimates that an export cannot.

OptionUse it whenWhat to do
Finance figuresBudget vs actualYou have budget and actual spend by cost line and month, from your finance system or a spreadsheet.Choose the file; the columns are matched for you and the Financial tab opens. See section 7.
Export from any appAnything else that isn't sprintsYour numbers come from another app: incidents, deployments, test results, budgets, timesheets, surveys, risk registers. Also sprint data from Azure DevOps, Linear, Monday.com or ClickUp.Pick a recipe for your app (see section 4) or Custom, follow its export steps and load the file. Check the preview, then click Import. Dated files fill in Trends month by month.
Sprints → Jira Sprint Report (paste)Most accurateYou use Jira and want figures that match Jira's Sprint Report exactly.In Jira open Reports → Sprint Report and pick the sprint. Select the page (Ctrl/Cmd + A), copy, and paste it into the box. The sprint report opens by itself: the team, sprint name and dates are read from the page. The same box is on the Sprint review card of the start screen. Do one sprint at a time.
Sprints → Jira issue exportFastest for many sprintsYou want several sprints or teams in one go.In Jira search, filter to your sprints, e.g. project = ABC AND sprint in closedSprints(), then Export → Export CSV (all fields). Choose the file and click Import issues. The tool reads Sprint, Status Category, Story Points, Issue Type, Created and Resolved.
Sprints → Sprint summary fileYou keep one row per sprint in a spreadsheet.One row per sprint. Click Download template for the column layout, fill it in, then Import sprints. Only Sprint and Delivered SP are required.
Metric valuesYou already have the finished numbers.Click Download template; it lists every entered metric on your framework. Fill in the Value column and click Import values. Use Portfolio as the team for organisation-wide figures, and add a Period column (e.g. 2026-09) to load several months of history at once.
Sprints → Type a sprint inYou have a handful of sprints and the numbers to hand.Enter committed and delivered points (plus anything else you know) and click Add sprint.

Sprint summary columns

Team, Sprint, Start, End, Committed SP, Delivered SP, Not Completed SP, Removed SP, Issues Completed, Lead Time

  • Dates can be 2026-09-14, 14/09/2026 or Jira's 14/Sep/26.
  • If you leave out Not Completed SP, it's worked out as committed minus delivered.
  • If the file has no Team column, type the team name in the Team box before importing.
  • Commas, semicolons and tab-separated files all work, and so do Excel files (.xlsx). Title rows above the column headers are skipped.

Importing again

Re-importing a sprint with the same team and name replaces it, so you can safely re-run an export each sprint. Teams and sprints are listed lower down the Data tab, where you can rename or remove them.

Jira issue exports don't hold sprint-start estimates. The CSV only carries today's story points, so if issues were re-estimated mid-sprint, "Committed" won't match Jira. The Sprint report flags this. When you need exact figures for a sprint, paste the Sprint Report for that sprint under the same team and sprint name, and it replaces the CSV version.

Section 04

Data from any app

Every metric on the framework can be fed from a file, not just the sprint ones. On the Data tab choose Export from any app, pick the recipe for your app, and follow its export steps. The recipe fills in the column mapping and the calculation for you; you can change any of it before importing. Each recipe also has Try it with sample data, so you can see the result before exporting anything.

How a file becomes a metric

  1. Team. A column that says which team each row belongs to (assignment group, area path, project, cost centre), or one team for the whole file, or the organisation as a whole (Portfolio).

  2. Month. A date column groups rows by month. The latest month goes on the scorecard; earlier months appear on Trends. Leave it out for "as of today" counts such as open backlog.

  3. Calculation. count rows; count distinct values; sum of a column; average of a column; median of a column; 85th percentile of a column; lowest value; highest value; % of rows matching a condition; % of a column's total where a condition holds; column a ÷ column b, as %; column a − column b (totals); average of column a × column b; time between two dates; age: today − a date; net promoter score (0–10 answers); rows per week.

  4. Filters. Keep only the rows you want, e.g. Priority is one of 1, 2, or Status is not Closed.

  5. Metric. Choose where the number goes. Recipes for DORA, Flow and Service Management metrics add those areas to your framework if they aren't there yet.

Dev tools 13 recipes

AppGives youHow to export
Jira
Defects found in production
Quality › Defect Leakage Filters → Advanced issue search, run the query, then Export → Export CSV (all fields). Label production bugs consistently (e.g. "production") or use an Environment field.
JQL
project = ABC AND issuetype = Bug AND created >= startOfMonth(-5) AND (labels = production OR environment ~ "prod") ORDER BY created DESC
Jira
Open tech-debt items
Strategic & Risk › Tech Debt Items Advanced issue search → Export → Export CSV (current fields is enough). Counts what is open today.
JQL
project = ABC AND labels = tech-debt AND statusCategory != Done ORDER BY priority DESC
Jira
Cycle time (created → resolved), 85th percentile
Flow › Cycle Time (85th percentile) Advanced issue search → Export CSV (all fields). Jira exports Created and Resolved; for true start-to-finish cycle time use Azure DevOps or Linear, which export a start date.
JQL
project = ABC AND statusCategory = Done AND resolved >= startOfMonth(-5) AND issuetype in (Story, Task, Bug) ORDER BY resolved DESC
Azure DevOps
Sprint reports from a work-item query
Sprint reports + Delivery metrics Boards → Queries → New query → Editor: Query → paste the WIQL (or build it), Run, then ⋯ → Export to CSV. Add the Story Points, Iteration Path, Area Path, Created Date and Closed Date columns.
WIQL
SELECT [System.Id], [System.WorkItemType], [System.Title], [System.State], [System.IterationPath], [System.AreaPath], [Microsoft.VSTS.Scheduling.StoryPoints], [System.CreatedDate], [Microsoft.VSTS.Common.ClosedDate]
FROM WorkItems
WHERE [System.TeamProject] = @project
  AND [System.WorkItemType] IN ('User Story', 'Bug', 'Task')
  AND [System.IterationPath] UNDER @project
  AND [System.ChangedDate] >= @today - 180
ORDER BY [System.IterationPath]
Azure DevOps
Cycle time (activated → closed), 85th percentile
Flow › Cycle Time (85th percentile) Run the query, then Export to CSV with the Activated Date and Closed Date columns. Dates follow your Azure DevOps locale; US-format exports are read month-first.
WIQL
SELECT [System.Id], [System.WorkItemType], [System.AreaPath], [Microsoft.VSTS.Common.ActivatedDate], [Microsoft.VSTS.Common.ClosedDate]
FROM WorkItems
WHERE [System.TeamProject] = @project
  AND [System.State] = 'Closed'
  AND [Microsoft.VSTS.Common.ClosedDate] >= @today - 180
Azure Test PlansTestRailXrayZephyr
Test pass rate
Quality › Test Pass Rate Export test results or test runs to CSV/Excel: Azure Test Plans (Test Plans → Progress report → Export), TestRail (Run → Export → CSV), Xray / Zephyr (test execution → Export). One row per test result with an Outcome / Status column.
Filter
Test runs completed in the last 6 months; include Outcome (or Status), Run date and Team / Suite.
GitHub
Deployment frequency (Actions deploy workflow)
DORA › Deployment Frequency GitHub has no CSV export for workflow runs, so use the GitHub CLI (gh). The command writes a CSV with a header row; change deploy.yml to your production deploy workflow. Run once per repo and set Team to the repo or team name.
GitHub CLI
gh run list --workflow deploy.yml --branch main --limit 1000 \
  --json createdAt,conclusion,headBranch \
  --jq '["created","conclusion","branch"], (.[] | [.createdAt, .conclusion, .headBranch]) | @csv' > deploys.csv
GitHub
Lead time for changes (PR opened → merged)
DORA › Lead Time for Changes Use the GitHub CLI. This measures pull request open → merge, a common stand-in for DORA lead time when deploys follow merges to main.
GitHub CLI
gh pr list --state merged --base main --limit 1000 \
  --json number,createdAt,mergedAt \
  --jq '["number","created","merged"], (.[] | [.number, .createdAt, .mergedAt]) | @csv' > prs.csv
GitHub
Issues closed per month (throughput)
Flow › Throughput Use the GitHub CLI to export issues as CSV (labels are joined with ";").
GitHub CLI
gh issue list --state closed --limit 2000 \
  --json number,title,labels,createdAt,closedAt \
  --jq '["number","title","labels","created","closed"], (.[] | [.number, .title, ([.labels[].name] | join(";")), .createdAt, .closedAt]) | @csv' > issues.csv
GitLab
Deployment frequency (production environment)
DORA › Deployment Frequency Use the GitLab CLI (glab) with jq. Replace 123 with your project ID.
GitLab CLI
glab api "projects/123/deployments?environment=production&status=success&per_page=100" --paginate \
  | jq -r '["created","status","ref"], (.[] | [.created_at, .status, .ref]) | @csv' > deploys.csv
Azure Pipelines
Deployment frequency (release pipeline runs)
DORA › Deployment Frequency Use the Azure CLI (az devops extension). Replace 42 with your production pipeline ID. The first line writes the header row.
Azure CLI
(printf "finished\tresult\tbranch\n"; az pipelines runs list --pipeline-ids 42 --top 1000 \
  --query "[].[finishTime, result, sourceBranch]" -o tsv) > deploys.tsv
Linear
Sprint reports from cycles
Sprint reports + Delivery metrics Settings → Workspace → Import / Export → Export CSV (or select issues in a view → ⋯ → Export). Cycles are read as sprints; Estimate as points.
Linear filter
Team is <your team> · Cycle is any of <last 6 cycles> · Type: all issues
Linear
Cycle time (started → completed), 85th percentile
Flow › Cycle Time (85th percentile) Export issues as CSV. Linear includes Started and Completed timestamps, so this is true start-to-finish cycle time.
Linear filter
Status type is Completed · Completed date is after 6 months ago

Work management 9 recipes

AppGives youHow to export
Monday.com
Sprint reports (monday dev sprints)
Sprint reports + Delivery metrics Board ⋯ → More actions → Export board to Excel. Load the .xlsx directly; title and group rows are skipped. Needs Sprint, Status and Story Points (or Estimate) columns.
Board view
Filter: Sprint is any of <last 6 sprints>. Show columns: Name, Sprint, Status, Story Points, Team.
Monday.com
Items completed per month
Flow › Throughput Export board to Excel. Add a "Completion date" (or Date) column on the board, or use a Last updated column, so items can be counted by month.
Board view
Filter: Status is Done · Completion date is in the last 6 months
Asana
Cycle time (created → completed), 85th percentile
Flow › Cycle Time (85th percentile) Project → ⌄ menu → Export / Print → CSV. Asana includes Created At, Completed At and Projects.
Asana search
Advanced search → Completed: within the last 6 months · In projects: <your projects> → Export CSV
Asana
Tasks completed per month
Flow › Throughput Export the project (or an Advanced search result) as CSV.
Asana search
Completed: within the last 6 months · In projects: <your projects>
ClickUp
Sprint reports from sprint lists
Sprint reports + Delivery metrics Open the Sprint folder → List view → ⋯ → Export view (CSV). Each sprint is a List, so the List name becomes the sprint. Add Sprint Points (or a Story Points field).
ClickUp view
Sprint folder · All lists · Include closed tasks · Columns: Task Name, Status, Sprint Points, List Name, Date Created, Date Closed
ClickUp
Cycle time (created → closed), 85th percentile
Flow › Cycle Time (85th percentile) List view → ⋯ → Export view (CSV) with Date Created and Date Closed. Written-out dates ("Wednesday, October 8th 2026") are understood.
ClickUp view
Filter: Status is closed · Date Closed is last 6 months
Trello
Cards finished per month
Flow › Throughput Trello Premium / Enterprise: board menu → Print, export and share → Export as CSV. Counts cards in your Done list by their last activity date (free Trello exports JSON only).
Board
Cards in list "Done" (archive older cards to keep the export small)
Any tracker
Work in progress today
Flow › Work in Progress Export everything that is not finished from Jira, Azure DevOps, Linear, Asana, ClickUp or Monday. Counts items in an in-progress status at the time of export.
JQL (Jira example)
project = ABC AND statusCategory = "In Progress" ORDER BY updated DESC
Any tracker
Work item age (in-progress items)
Flow › Work Item Age Export in-progress items with a start date: Azure DevOps Activated Date, Linear Started, Asana / ClickUp Start Date, or Jira Created (as an approximation).
WIQL (Azure DevOps example)
SELECT [System.Id], [System.AreaPath], [Microsoft.VSTS.Common.ActivatedDate] FROM WorkItems WHERE [System.TeamProject] = @project AND [System.State] = 'Active'

Service & ops 12 recipes

AppGives youHow to export
ServiceNow
Time to resolve incidents (days)
Operations › Time to Resolve Incident → All, paste the filter into the list URL (sysparm_query) or build it with the condition builder, show Number, Opened, Resolved, Assignment group, Priority, then right-click a column header → Export → CSV (or Excel).
ServiceNow filter
resolved_atRELATIVEGT@month@ago@6^ORDERBYDESCresolved_at
ServiceNow
Mean time to resolve, P1/P2 (hours)
Service Management › Mean Time to Resolve Same incident export as above, restricted to priority 1 and 2.
ServiceNow filter
priorityIN1,2^resolved_atRELATIVEGT@month@ago@6
ServiceNow
Time to restore service, P1/P2 (DORA, hours)
DORA › Time to Restore Service Major / P1–P2 incident export with Opened and Resolved. Median is used so one long outage does not hide the typical restore time.
ServiceNow filter
priorityIN1,2^resolved_atRELATIVEGT@month@ago@6
ServiceNow
Incidents resolved within SLA (%)
Service Management › SLA Met Incident export with the Made SLA column (made_sla).
ServiceNow filter
resolved_atRELATIVEGT@month@ago@6
ServiceNow
Incident volume per month
Service Management › Incident Volume Incident export of everything opened in the period.
ServiceNow filter
opened_atRELATIVEGT@month@ago@6^ORDERBYopened_at
ServiceNow
Open incident backlog today
Service Management › Open Backlog Incident → Open list, export to CSV. Counts what is open at the time of export.
ServiceNow filter
active=true^stateNOT IN6,7,8
ServiceNow
First contact resolution (never reassigned)
Service Management › First Contact Resolution Resolved-incident export including the Reassignment count column.
ServiceNow filter
resolved_atRELATIVEGT@month@ago@6
ServiceNow
Change failure rate (unsuccessful changes)
DORA › Change Failure Rate Change → All, closed changes in the period, with Close code and Assignment group, exported to CSV.
ServiceNow filter (change_request)
closed_atRELATIVEGT@month@ago@6^close_codeISNOTEMPTY
Jira Service Management
Time to resolve requests and incidents (days)
Operations › Time to Resolve Filters → Advanced issue search with the JQL, then Export → Export CSV (all fields).
JQL
project = SUP AND resolved >= startOfMonth(-5) ORDER BY resolved DESC
Jira Service Management
Support lead time (service requests)
Operations › Support Lead Time Advanced issue search → Export CSV (all fields).
JQL
project = SUP AND issuetype = "Service Request" AND resolved >= startOfMonth(-5) ORDER BY resolved DESC
DatadogUptimeRobotPingdom
System uptime %
Systems Performance › System Uptime Export uptime per monitor per day: Datadog (SLO → Export CSV), UptimeRobot (Monitor → Export logs / uptime report CSV), Pingdom (Reports → Uptime → Export CSV). One row per monitor per day with an uptime %.
Report
Uptime report, daily granularity, last 6 months, all production monitors
DatadogNew Relic
Request success rate (reliability)
Systems Performance › System Reliability Export a daily table of successful and total requests per service (Datadog dashboard widget → Export → CSV; New Relic query results → Export CSV).
NRQL (New Relic example)
SELECT count(*) AS 'Total', filter(count(*), WHERE httpResponseCode < 500) AS 'Successful' FROM Transaction FACET appName SINCE 6 months ago TIMESERIES 1 day

Business data 9 recipes

AppGives youHow to export
XeroMYOBSAPExcel
Opex variance (budget − actual)
Financial › Opex Variance Export a budget-vs-actual report to Excel or CSV with one row per cost centre (or team) per month: Xero (Reports → Budget Variance → Export → Excel), MYOB (Budget analysis → Excel), SAP (cost centre report → Spreadsheet). Positive = under budget.
Report
Budget variance by month, operating expenses, by tracking category / cost centre, last 6 months
Finance spreadsheet
Cost recharge variance (recharged − planned)
Financial › Cost Recharge Variance Export the recharge / chargeback schedule with planned and recharged amounts per team per month.
Report
Chargebacks by team and month: Planned recharge, Actual recharge
HarvestTempoClockify
Utilisation (% of hours on billable or planned work)
DevOps & Culture › Utilisation & Capacity Export detailed time entries to CSV or Excel: Harvest (Reports → Detailed time → Export), Tempo (Reports → Logged time → Export), Clockify (Reports → Detailed → Export). Needs Hours and a Billable (or Project / Category) column.
Report
Detailed time report, last 6 months, grouped by person, with Billable flag
SurveyInSiteTypeformQualtricsGoogle FormsSurveyMonkey
Net Promoter Score
Customer Satisfaction › NPS Score Export responses to CSV or Excel: SurveyInSite (Results → Export), Typeform (Results → Download CSV/XLSX), Qualtrics (Data & Analysis → Export → CSV), Google Forms (Responses → Link to Sheets → File → Download → CSV), SurveyMonkey (Analyze → Save as → Export file → All responses).
Survey
"How likely are you to recommend us to a friend or colleague?" (0–10), plus the response date and (optionally) a team / product question
Any survey tool
Customer rating (average score)
Customer Satisfaction › Customer Rating Export responses with a 1–5 (or 1–10) satisfaction question.
Survey
"Overall, how satisfied are you?" (1–5)
Agile maturity survey
Agile maturity (average self-assessment)
DevOps & Culture › Agile Maturity Run a team self-assessment (1–5 per practice) in any survey tool and export the responses. Each row is one person's overall or per-practice score.
Survey
Team (choice) · "Rate your team's practice maturity" (1–5) · response date
Skills matrix (Excel)
Skills coverage (% of required skills at level 3+)
DevOps & Culture › Skills Coverage One row per person per required skill with a proficiency level (1–5). Save the skills matrix sheet as CSV, or load the .xlsx.
Sheet
Columns: Team, Person, Skill, Level (1–5)
Risk register (Excel / GRC tool)
IT risk score (average likelihood × impact, open risks)
Strategic & Risk › IT Risk Score Export the risk register (Excel, ServiceNow GRC, Archer…) with Likelihood and Impact ratings (1–5) and Status.
Register
All risks with Status not Closed; columns Team / Owner area, Likelihood, Impact, Status
Incident / breach register
Data privacy breaches per month
Strategic & Risk › Data Privacy Breaches Export the security / privacy incident register (or ServiceNow security incidents) with a Category and Date reported.
ServiceNow filter (sn_si_incident)
categoryLIKEprivacy^sys_created_onRELATIVEGT@month@ago@12

Your app isn't listed? Choose Custom. If the app can export a table with a team, a date and something to count or measure, it can feed a metric. Excel files work as they are; dates can be ISO (2026-10-08), day-first (08/10/2026), month-first for US-locale exports, Jira style (08/Oct/26) or written out (October 8th 2026).

Section 05

Set your targets

The Framework tab holds the areas and metrics on your scorecard. The default has eight areas: Delivery, Operations, Systems Performance, Quality, DevOps & Culture, Financial, Strategic & Risk and Customer Satisfaction. For each metric you can set:

  • Target: the number you're aiming for.
  • Better when: Higher (velocity, NPS) or Lower (lead time, defects).
  • Amber band: how far off target still counts as "near" (5%, 10%, 20% or 30%).
  • Source: Entered means you type or import the value. Auto means it's calculated from sprint data (velocity, commitment ratio, completion rate, throughput, scope change, lead time).
  • Roll-up: how team values combine into the portfolio figure: mean, sum or worst.

Rename, add or remove anything to fit how your organisation reports. If you want to start lean, pick Lean delivery from the template list and click Replace with template.

To add whole areas beside the ones you have, pick a pack and click Add to framework:

  • DORA: Deployment Frequency, Lead Time for Changes, Change Failure Rate, Time to Restore Service.
  • Flow: Cycle Time (85th percentile), Throughput, Work in Progress, Work Item Age, Flow Efficiency.
  • Service management: Incident Volume, Mean Time to Resolve, SLA Met, Open Backlog, First Contact Resolution.
Section 06

Read the scorecard

The Scorecard shows every metric for one team, or for the whole portfolio, with a status against its target:

  • On target: at or better than the target.
  • Near target: worse than target, but within the amber band.
  • Off target: beyond the amber band. A target of 0 (e.g. security breaches) has no amber band, so anything above it is red.
  • No target: no target set, or no value yet.

Use the team buttons at the top right to switch between teams and Portfolio. Auto metrics fill themselves in from each team's latest sprint, and you can type entered metrics straight into the table. On the portfolio view, auto metrics pool every team's points (not an average of percentages), and entered metrics roll up from the teams unless you type a portfolio figure.

Vs target: the bullet graph

Each row carries a small bullet graph so you can see how far a metric is from its target, not just which colour it is. The bar is the actual value, the tick is the target, and the three shaded bands are the amber zone from the Framework tab: the darkest band is on target, the middle band is near target, the lightest is off target. A metric with no target shows the bar alone.

Trend · last 6: the sparkline

The Trend · last 6 column draws a word-sized line of the last six snapshots for this team or portfolio, ending with today's value, so you see the shape of the last half-year at a glance. Small moves look small: the line's height never exaggerates a change of a few per cent. Beside it is the change since the previous snapshot. The arrow follows the number (▲ it went up, ▼ it went down) and the colour says whether that is good for this metric: green is better, red is worse, so a falling lead time shows a green ▼. Until two points exist the cell reads no history yet; record snapshots (section 11) and it fills in.

When a target is zero, or the value is below zero (breaches, variances), a bar can't show the distance, so the Vs target cell states it in words instead: at target, or the amount over or under, tinted by status.

Pack notes

Under the snapshot bar, the Pack notes card holds a Headline (one sentence) and Decisions required (one per line). Both are saved when you leave the field and appear on page one of PDF — steering pack and on PDF — executive one-pager. Leave the headline blank and the pack writes its own from the on-target counts.

Financial panel

For the full financial report, use the Financial tab (section 7). On the Scorecard, when your framework has a Financial area, a panel under it shows Variance to plan: for each metric with a value and a target, the gap as an amount and as a percentage, mint when favourable and rose when not (the target is the plan, the value is the actual). If the file loaded on the Data tab uses the Opex variance or Cost recharge variance recipe, a bridge walks from the budget (outlined) to the actual (solid) one cost centre at a time; choose another column to group by from the picker in its heading. The sign convention is printed under it: Expense lines: variance = actual − budget; positive = over budget.

Section 07

Financial report

The Financial tab turns a budget-vs-actual export into the report a finance or steering review expects: where spend stands against budget today, where the year will land, which cost lines and teams are driving the difference, and what the steering group should know.

Get the figures in

  1. Export budget vs actual from your finance system or spreadsheet with one row per cost line per month: Month, Cost line, Budget, Actual, plus Team, Type (opex or capex) and Forecast if you have them. Download the template shows the layout.

  2. Choose the file on the Financial tab (Choose a CSV or Excel file), or on the Data tab under Finance figures. Columns are matched by name and the report opens straight away. If a column can't be matched, pick it from the lists and click Import figures.

  3. One-period reports. A budget variance report for a single month has no month column. Set No month column? All rows are for to the month it covers, then import. Import each month's report the same way to build the year.

  4. Each month, import again. New months are added and months already there are updated, so a fresh export after month-end is all it takes. Try it with sample figures loads a FY27 budget with three months of actuals and a reforecast.

ColumnAlso matched asNotes
MonthPeriod, Date, Posting period, Fiscal period2026-07, Jul-26, July 2026, 07/2026, 31/07/2026 or an Excel date.
Cost lineAccount, GL account, Category, Expense type, Project, Cost centreRows named Total, Subtotal, Net or Gross are left out so nothing is counted twice.
TeamDepartment, Business unit, Division, ProductOptional. Gives the per-team view and the team buttons.
TypeCost type, Classification, Opex/CapexOptional. Capex, Capital or Capitalised counts as capex; anything else is opex.
Budget and ActualPlan, Budgeted · Actuals, Spend, Amount$1,234, (1,234), 1,234- and 12k are all read correctly. A month needs at least one of the two.
ForecastReforecast, Latest estimate, OutlookOptional. Used for the months without actuals.

Read the report

The headline and findings say where spend stands, where the year lands, the largest overspend and underspend, and whether the run rate tells a different story. Under them, five tiles:

TileCalculation
Spend to dateActuals for every month with actuals, against the budget for the same months
Full-year outlookActuals to date + the forecast (or the budget, where there is no forecast) for the months left, against the full-year budget
Run rateAverage monthly actual over the last three months with actuals
Budget usedSpend to date ÷ full-year budget, with the share of the year gone as the tick
Capex shareCapex actuals ÷ all actuals to date (when the file has a Type column)

The charts use the IBCS scenario notation, the same in the PDF: outlined = budget, solid = actual, hatched = forecast.

  • Monthly spend against budget: a pair of columns per month, and a strip underneath with each month's actual minus budget.
  • Cumulative spend against budget: budget (dashed grey), actual to date (solid) and the outlook (dashed violet) through the year.
  • Variance by cost line: the gap to budget to date as a bar and as a percentage pin.
  • Budget to actual: a bridge from budget to actual, one cost line at a time. When the steps are small next to the totals, the axis starts above zero and both total bars carry a break mark to say so.
  • Cost lines and By team tables with a status for each: On budget, Slightly over (within the tolerance, 5% unless you change it) or Over budget.

The sign convention is printed under every chart: variance = actual − budget, so a positive variance is over budget (rose) and a negative one under budget (mint).

Teams, years and settings

The team buttons narrow everything to one team; All teams shows the whole ledger. A cost line name used by more than one team (Staff, say) is shown per team. When the file covers more than one financial year, a Year picker appears. Under Settings and data: the month the financial year starts (July unless you change it; a year is named by the year it ends, so July 2026 to June 2027 is FY27), the tolerance for Slightly over, Download the figures (CSV) and Remove finance figures.

On the scorecard and in the PDF

Importing fills the Scorecard's Financial area for each team and the portfolio: Opex Variance (budget − actual for opex lines, year to date, so positive is under budget), Run Rate and Full-year Outlook Variance (budget − outlook). They feed the steering pack, the roll-up and the one-pager like any other metric. Write the points you want discussed under Commentary; they become the numbered comments in Download financial pack (PDF).

Section 08

Sprint report

The Sprint report tab covers one sprint for one team: committed vs delivered points, a scope bridge, velocity across sprints, issue types and, if you pasted a Sprint Report, the issues themselves. There's space for sprint goals, an executive summary and recommendations, which are included in the PDF.

Committed vs delivered, every sprint

One bullet graph per sprint for the team: the bar is what was delivered, the tick is what was committed at sprint start, and the shaded bands are the amber zone of your Commitment Ratio metric. A bar that reaches the tick is a sprint delivered as committed; the sprint you have open is highlighted.

Scope bridge

The bridge walks from Committed (outlined) to Delivered (solid): scope added mid-sprint in mint, scope removed and work not completed in rose. The note underneath gives the final scope (committed + added − removed). If the steps don't add up, an "Unexplained" step in grey shows the difference.

Velocity & commitment

Delivered points per sprint as a run chart: the shaded band is the team's usual range (mean ± 1.5 standard deviations) and the dashed line its mean. A sprint ringed in rose is outside the usual range and worth a conversation; a run of sprints drifting to one side of the mean is a trend.

The three rates

RateCalculationQuestion it answers
Delivery rateDelivered ÷ committed at sprint startDid the team deliver what it signed up for? This is the scorecard's Commitment Ratio.
Completion rateDelivered ÷ final scope (delivered + not completed)How much of what the sprint became got done?
All-in rateDelivered ÷ final scope + removedCounting work pulled out of the sprint too, how much got done?

When the rates differ, the gap is scope change. The report spells out how much was added or removed. A delivery rate above 100% means work was added mid-sprint and delivered.

Section 09

Cross-team roll-up

The Roll-up tab puts every team and the portfolio side by side as a heatmap. Needs attention lists teams that are off target or trending down, and Velocity by team compares rolling three-sprint velocity. This is the page to bring to a steering meeting.

Reading the heatmap

  • Rows are teams, with the Portfolio as the last row; columns are the metrics that have a target.
  • Shade is one colour from light to dark: the lightest cells are on target, the darker the cell the further it is from target. Grey means no value yet.
  • Each cell shows the value and an arrow for the move since the last snapshot: ▲ up, ▼ down, – steady. The arrow's colour says whether that is good for this metric (green better, red worse).
  • Hover a cell for value vs target and status. Table shows every metric for every team, including metrics without a target, with the status written out.
Section 10

Flow & DORA

The Flow tab, next to the Scorecard, answers two questions: how healthy is delivery against the four DORA keys, and how is work actually moving through the system?

DORA tiles

One tile per DORA metric (deployment frequency, lead time for changes, change failure rate, time to restore service) for the team or portfolio you have selected: the value, its status, the trend since the last snapshot (▲ improving, ▼ declining) and a band underneath. The band is your target and amber zone from the Framework tab, drawn the same way as the scorecard's bullet graph: the bar is the value, the tick is your target. It is not an industry benchmark; set the targets that suit your organisation. If the DORA pack isn't in your framework yet, the tab shows an Add DORA pack button.

Flow charts

The flow charts are drawn from the work-item file currently loaded on the Data tab, one dot per item. Load a cycle-time recipe (Jira, Azure DevOps, Linear, Asana or ClickUp) or Any tracker — Work item age (in-progress items), or press Try it with sample data, then open the Flow tab. Choose a team with the team buttons to narrow the charts to that team's items.

  • Cycle time, finished items (cycle-time recipes): each finished item plotted by the date it finished and how many days it took, with the p50, p85 and p95 lines. "p85 · 9 d" means 85% of items finished within nine days, which is a fair forecast to give a stakeholder. Items above p95 are highlighted and labelled. Items above p85 are the ones to talk about.
  • Work item age, in progress: unfinished items by stage and how long they have been open. Pick the Stage column (status, board column) to split them; with none, they sit in one In progress column. Items older than p85 are highlighted. The p85 and p95 lines come from finished items in the same file, else from your saved Cycle Time metric, else from the current ages.
  • Cumulative flow, last 12 weeks: Done at the bottom and In progress above it, week by week. Bands that widen mean work is arriving faster than it finishes.
  • Throughput, items finished per week: a run chart with the usual range shaded (mean ± 1.5 standard deviations). Weeks outside the range are ringed.

Item rows are never saved: they stay in your browser's memory until you close or refresh the page, so load the file again next time. The monthly figure from the same file is what goes on the scorecard when you press Import.

Section 12

Export & share

Everything is under Export & share at the top right of the tool:

OptionWhat you get
PDF — steering packA landscape PDF. Page one is the headline, a health row (on, near, off, no target), the scorecard with bullet graphs and sparklines, what needs attention and the decisions required; then the cross-team roll-up, the latest sprint for each team and the direction of travel. Your Pack notes headline and decisions appear on page one.
PDF — executive one-pagerOne portrait A4 page for someone with two minutes: the headline, the health row, six stat tiles for the metrics furthest from target (value, change since the last snapshot, status and a sparkline), then What changed, At risk and What we need from your Pack notes decisions.
PDF — portfolio healthA landscape PDF for the portfolio review: your Pack notes headline, the heatmap of every team against every target, what needs attention, small multiples of the portfolio's history per area, and the decisions required.
PDF — financial packA landscape PDF of the Financial tab: the headline and findings, four stat tiles (spend to date, full-year outlook, run rate, budget used), monthly spend against budget, cumulative spend, the variance table with absolute and relative variance drawn into each row, the budget-to-actual bridge, the team table and your commentary as numbered comments. The same button sits at the top of the Financial tab. Without finance figures it falls back to the Scorecard's Financial metrics.
PDF — flow & DORA reviewA landscape PDF of the Flow tab: the DORA tiles with their target bands, then the cycle-time scatter, work item age, cumulative flow and weekly throughput from the loaded work-item file, each with a one-line reading note. Available once a DORA metric has a value or a work-item file is loaded.
PDF — this sprint reportThe sprint currently open on the Sprint report tab: committed vs delivered as a bullet per sprint, the scope bridge, the velocity run chart, the issue tables and your goals, summary and recommendations.
CSV — scorecard valuesEvery metric for every team with target and status, ready for Excel or Power BI.
CSV — sprint dataAll sprints and their calculated rates.
Copy share linkA link with the report packed inside it. Whoever opens it sees your report and can keep a copy. Nothing is stored on our servers, so treat the link like the file itself.
Back up (JSON) / Restore from backupA full copy of everything, to move to another computer or keep safe.

Financial pack

PDF — financial pack is built for the finance or steering review. Import your budget-vs-actual figures on the Financial tab (section 7), choose the team and year you want, and write the points you want discussed under Commentary; they become the numbered comments. Without finance figures, the pack is built from the Scorecard's Financial metrics instead: set a target (the plan) and a value (the actual) for each, load the Opex variance recipe for the bridge, and the Decisions required in Pack notes become the comments. The pack prints the sign convention, Expense lines: variance = actual − budget; positive = over budget, so nobody has to guess which way a number points. If neither variance rows nor a bridge exist, the menu item tells you what is missing instead of producing an empty PDF.

Accounts and plans

Exploring every report needs no account. Downloading a PDF or creating a share link asks for a free account: type your email, open the sign-in link we send, and you come straight back to the tool with everything still loaded. The badge next to your organisation name shows your plan; click it to open your account page.

FreePro (US$29 per author a month, or US$290 a year)
ReportsAll sixAll six
Teams in the roll-up, portfolio health PDF and steering packUp to 3Unlimited
PDFs and share linksCarry a small "Made with ReportInSite" footerYour logo, no ReportInSite footer (Data tab → PDF branding → Choose a logo)
AI narrative on Magic reportsNot included200 a month
Report templatesBuilt-in templatesSave your own (Framework tab → Save as template, then Apply)
Backups and CSV exportsAlwaysAlways

Every new account gets Pro free for 30 days, then carries on free unless you upgrade. People who receive your PDFs or share links never need an account. Upgrading starts from the pricing page; change or cancel a subscription with Manage billing on your account page. What we record about an account is listed on Security & data.

Section 13

Your data & backups

ReportInSite runs entirely in your browser. What you import or type is saved on your own device and is not uploaded. That means:

  • Your report is there next time you open the tool in the same browser on the same computer.
  • Clearing browser data, or using a private window, removes it. Back up (JSON) regularly, especially before clearing your browser.
  • To work on another computer, back up on one and Restore from backup on the other.
  • Clear data at the top of the tool removes everything, including framework changes, so you can start again. If you only want to remove your teams and sprints but keep your framework and targets, use Data → Start over instead.

More detail is on the Security & Data page.

Section 14

Troubleshooting

"No story points column found"

Your Jira export didn't include story points. Make sure you choose Export CSV (all fields), not "current fields". Issue counts and lead time still work without points.

The pasted Sprint Report adds nothing, or the numbers look wrong

Copy from Jira's Sprint Report page itself, starting at the "Completed work items" heading (older Jira: "Completed Issues"), and paste without tidying it up. If you see "found work item keys but no section headings", your selection missed the headings: copy again from the heading line. The tool relies on Jira's tab spacing.

"The file needs Area, Metric and Value columns"

You've chosen Metric values (CSV) for a sprint file. Use Sprint summary (CSV) or Jira issue export (CSV) instead, or start from the template.

Some metric values were "not in your framework"

The Area and Metric names in your CSV must match the Framework tab exactly. Download the template again to get the current names.

Committed doesn't match Jira

See the note in section 3: paste the Sprint Report for that sprint for exact figures.

My data has gone

Check you're in the same browser and not a private window. If browser data was cleared, restore from your last backup.